150 PSI, 6 gal, 2.6 SCFM
Dual output ports
Before use:
Download the manual from this listing.
Test Pressure Relief Valve, close Drain Valve, set Pressure for tool you'll use.
When finished:
Reduce pressure to 20psi, use pressure relief valve
Open Drain Valve and tip to remove any condensation.
Add a little pressure for storage, about 10psi